Urbanrise Whitefield Overview

Urbanrise Whitefield is planned as five high-rise residential wings and a club house in Hagadur village, Whitefield, set among landscaped parks and open space that take up about a third of the net site area. Among the new residential projects in Whitefield it is at an early stage, with its environmental clearance granted and its K-RERA registration still to come, and the Urbanrise Whitefield project details are gathered here in one place: the place, the cleared scheme, the approvals, the developer and the questions to ask first. In the same Bengaluru market, Vaishnavi AT-One Life Phase 4 helps frame how another project presents scale, location logic, and the trade-offs a household should resolve before shortlisting.

Status as at 18 October 2026. Urbanrise Whitefield is a pre-launch project and is not registered with K-RERA. It holds its environmental clearance, granted on 8 August 2024; its building-plan sanction has not been published, and Urbanrise does not yet list the project on its own website. The launch date, possession timeline and prices have not been announced. Under section 3 of the RERA Act 2016, wait for the K-RERA registration before you pay anything. A same-developer shortlist can feel simpler than it really is; Urbanrise BK Halli keeps attention on how each Bengaluru address solves a different routine, budget, and documentation question.

Urbanrise Whitefield is the working name this site uses for the project; Urbanrise has not announced a brand name for the development, so the name may change.

Urbanrise Whitefield in Hagadur, Whitefield

Hagadur is a village of Whitefield in East Bengaluru, east of Whitefield Main Road and within reach of the Purple Line and ITPL, and Urbanrise Whitefield is one of the upcoming projects in East Bangalore planned there. The site is in Hagadur village, K.R. Puram hobli, Bengaluru East taluk, PIN 560066: part of Whitefield, within the Bengaluru East City Corporation.

The entry and exit are at the south-east corner of the site, on an existing 18.5 m approach road that connects to Vijayanagar Main Road and on to Whitefield Main Road (SH-35). From that gate, the nearest Namma Metro station by road is Hopefarm Channasandra on the Purple Line, about 3.6 km away, and the nearest railway station by road is Whitefield, about 5.2 km.

Distances are measured by road from the site's south-east gate and rounded to one decimal; they are not travel times.

From the site's south-east gateBy road
Immadihalliabout 1.0 km
Whitefield Main Road, at its junction with Vijayanagar Main Roadabout 2.4 km
Hope Farm junctionabout 3.2 km
Hopefarm Channasandra metro station, Purple Lineabout 3.6 km
ITPLabout 5.0 km
Whitefield railway stationabout 5.2 km
Kempegowda International Airportabout 39.1 km

The location page sets out the full list of metro stations, work hubs, schools, hospitals and shopping, with the questions worth asking about the roads around Hagadur.

Urbanrise Whitefield Project Details

Homes of one to four bedrooms, in high-rise wings around a club house, make up Urbanrise Whitefield. The environmental clearance granted on 8 August 2024 covers 394 homes in five residential wings, A1 to A5, each planned as two basements, ground and 15 upper floors, up to 48.30 m high, with a club house of two basements, ground and three upper floors, on 5 acres 25 guntas (about 5.6 acres) of land. Plans can change before registration, so check the figures the K-RERA registration records.

ItemUrbanrise Whitefield
Homes394
Home mix1 BHK 39, 2 BHK 64, 3 BHK 216, 4 BHK 75
Residential wingsFive, A1 to A5
Each wingTwo basements, ground and 15 upper floors
HeightUp to 48.30 m
Club houseTwo basements, ground and three upper floors
Built-up area75,720.13 sq m (about 8.15 lakh sq ft)
Land5 acres 25 guntas (about 5.6 acres)
ParcelAbout 6.25 acres, of which 25 guntas is government land reserved for a stream channel
Car parking492 cars, about 1.25 spaces a home
Landscaped parks and open space7,237.31 sq m, about a third (33.47%) of the net site area

Each wing is planned at 16 storeys above ground, which places Urbanrise Whitefield among the high-rise apartments in Whitefield. Three-bedroom homes make up more than half of the 394, with four-bedroom homes the next largest group. Most of the parking for 492 cars is planned in the basements, and the clearance requires electric-vehicle charging for at least a quarter of the parking. The master plan page shows how the wings, the club house and the open space sit on the land, and the floor plans page covers the home types.

Pre-launch material circulating in October 2026 quotes a larger plan, of about 14 acres and about 1,050 homes in towers of two basements, ground and 25 upper floors, listed as 5 blocks and 11 towers; no filing or registration supports these figures as at 18 October 2026.

Urbanrise Whitefield RERA Registration and Approvals

Urbanrise Whitefield holds its environmental clearance, granted on 8 August 2024. The building-plan sanction, fire clearance and K-RERA registration are separate approvals, and none of them has been published as at 18 October 2026. The clearance states that the plan cannot be expanded or modified without a fresh environmental clearance.

Not registered with K-RERA as at 18 October 2026. No registration number has been announced. Under section 3 of the RERA Act 2016, wait for the K-RERA registration before you pay anything. When the project is registered, its number, promoter and proposed completion date can be checked on the official K-RERA website. A genuine Karnataka project registration number contains /PR/.

ApprovalStatus as at 18 October 2026
Land useConverted to residential use in February and March 2022
ZoningZoned Residential (Main) under the Bangalore Development Authority's Revised Master Plan 2015
Airport heightThe filing includes an Airports Authority of India height clearance for the building height, dated 16 June 2023 and valid to 15 June 2031; it does not cover the HAL airfield
Stream land25 guntas of government stream land realigned within the site by the Deputy Commissioner of Bengaluru Urban, 4 March 2024
Environmental clearanceGranted on 8 August 2024, held by Urbanrise Condominiums Private Limited
Building-plan sanctionNot published
Fire clearanceNot published
Water supplyNot published
K-RERA registrationNot registered

The zoning and the land conversion settle what the land may be used for; the building-plan sanction is the approval of what is to be built on it. The building-plan sanction has not been published, so this site names no authority as having approved the project's plans. Ask for each approval in writing, with its number and date, and for a copy of the environmental clearance with its conditions.

What Is Announced and What to Ask For

The homes, wings and club house of Urbanrise Whitefield are known in outline, and the table shows where each remaining detail stands.

ItemAs at 18 October 2026
Launch dateNot announced
Possession timelineNot announced
PriceNot announced
Floor plansNot published
Carpet areasNot published
Amenity listNot announced; the cleared plan shows a club house, a proposed swimming pool and landscaped parks and open space
Building-plan sanctionNot published
Water connectionNot published
Construction statusNot published
BrochureNot published

The launch date and possession timeline have not been announced. Urbanrise has not announced prices for Urbanrise Whitefield, and this site quotes none. The clearance requires half-yearly compliance reports, which you can ask the developer for.

What to Ask For

  • The K-RERA registration number, the promoter it names and the proposed completion date it records.
  • The building-plan sanction, with its number and date, and the authority that issued it.
  • The fire clearance and the water-board approval for the project.
  • Whether a height clearance covering the HAL airfield has been obtained, alongside the Airports Authority of India clearance in the filing.
  • The latest half-yearly compliance reports on the environmental clearance.
  • The carpet area of each home type as the K-RERA registration records it, and the area on which any price is quoted.
  • The amenity list, what the club house will contain and the size of the pool.

The Developer in Brief

Urbanrise is the residential brand of Alliance Group, with offices in Bengaluru, Chennai, Hyderabad and Dubai. Urbanrise's own listing shows 23 projects across Chennai, Hyderabad and Bengaluru; the builder page describes them. The environmental clearance is held by Urbanrise Condominiums Private Limited, and the K-RERA registration will name the promoter.

Urbanrise does not yet list Urbanrise Whitefield on its own website, so the promoter named on the K-RERA registration is the one to check against any agreement you are offered. The builder page sets out the developer's listing city by city, its leadership and how to check any developer's record, and the reviews page explains how to weigh it.

Next Steps for Buyers

Urbanrise Whitefield can be weighed well before any launch, and five steps cover the ground.

  1. Read the location page and visit Hagadur at the hours you would travel, from the approach road to Whitefield Main Road.
  2. Read the master plan page for the layout, the stream buffers and the land set aside for master-plan roads.
  3. Budget the statutory costs on the price page: about 12.60% of the agreement value on a home above ₹45 lakh in Whitefield.
  4. Keep the questions above to hand, and ask for each approval in writing, with its number and date.
  5. Send a question through the contact page to hear when the registration and prices are published.

Until the K-RERA registration is granted, treat any price, size or date you are quoted for Urbanrise Whitefield as unconfirmed, and pay nothing.

Urbanrise Whitefield Overview FAQs

What does the environmental clearance mean for a buyer?

Urbanrise Whitefield holds its environmental clearance, granted on 8 August 2024, and it sets the environmental conditions the project must meet. It is not a building-plan sanction or a K-RERA registration: the building-plan sanction, fire clearance and K-RERA registration are separate approvals, and none of them has been published as at 18 October 2026. The clearance states that the plan cannot be expanded or modified without a fresh environmental clearance. Ask for a copy of the clearance with its conditions before you pay anything.

How do I check whether a project is RERA registered in Bangalore?

Look the project up on the official K-RERA website, which lists each registered project, including those in Whitefield, with its registration number and promoter. A genuine Karnataka project registration number contains /PR/, while a number containing /AG/ belongs to a registered agent, not to a project. Check that the project name, the promoter and the address match the agreement you are offered. Urbanrise Whitefield is not registered with K-RERA as at 18 October 2026, so there is no number for it to check yet.

Is Urbanrise Whitefield a high-rise project?

Yes. Each of the five residential wings, A1 to A5, is planned as two basements, ground and 15 upper floors, up to 48.30 m high: 16 storeys above ground, which places Urbanrise Whitefield among the high-rise apartments in Whitefield. The club house is lower, at two basements, ground and three upper floors. These are the figures the environmental clearance granted on 8 August 2024 covers. Plans can change before registration, so check the figures the K-RERA registration records.

What has been announced about Urbanrise Whitefield so far?

The scheme is known in outline: the environmental clearance granted on 8 August 2024 covers 394 homes in five residential wings with a club house, on 5 acres 25 guntas. As at 18 October 2026, the launch date, possession timeline, price and amenity list have not been announced, and the floor plans, carpet areas, building-plan sanction, water connection, construction status and brochure have not been published. Treat any of these you are quoted before the K-RERA registration as unconfirmed.

What is the construction status of Urbanrise Whitefield?

Construction status has not been published as at 18 October 2026. The clearance sets conditions that come first: it requires 305 trees to be planted before construction begins and an assured water supply to be in place before construction starts. It also requires half-yearly compliance reports, which you can ask the developer for, and they show how its conditions are being met. Until the K-RERA registration is granted, pay nothing on the strength of any progress you are told about.

Can the Urbanrise Whitefield plan change before registration?

It can. The figures on this site are those the environmental clearance granted on 8 August 2024 covers: 394 homes in five residential wings of two basements, ground and 15 upper floors, with a club house. The clearance states that the plan cannot be expanded or modified without a fresh environmental clearance, and the building-plan sanction has not been published. Plans can change before registration, so check the homes, wings and areas the K-RERA registration records against what you are told.